March 13, 2025

A few updates:

  • Sheet rock was delivered,

  • Windows and doors in the lobby have been installed.

  • Inspections went well last week.

  • The drywall should start to go up Friday on the second floor.

  • Roofer is back to work on the lightning protection, cleaning the roof, and adjusting the hatch closure.

  • The shower inserts were delivered and should be installed soon.